CleanMax to supply RE power to Shell from upcoming 30 MW hybrid projects
PTI April 21, 2026 07:00 PM
Synopsis

CleanMax will power Shell's Gujarat LNG terminal and Karnataka technology centre. The company is building hybrid renewable energy plants in both states. Gujarat will receive power from a 16.83 MW solar and wind project. Karnataka's 13.2 MW hybrid plant will supply its Bengaluru technology centre. This initiative enhances energy stability for Shell's operations.

Listen to this article in summarized format

Loading...
×
New Delhi, Clean Max Enviro Energy will supply clean power to Shell's LNG terminal in Gujarat and technology centre in Karnataka from its upcoming 30 MW hybrid projects in the two states.

In Gujarat, CleanMax is developing a 16.83 MW hybrid renewable energy plant, comprising 6.93 MWp of solar and 9.90 MW of wind capacity.

Implemented under the group-captive model, the project will supply renewable power to Shell's LNG terminal at Hazira, Clean Max Enviro Energy Ltd (CleanMax) said in a statement on Tuesday.


The hybrid configuration is designed to support the energy-intensive operations of the LNG terminal, enhancing supply stability and operational resilience.

In Karnataka, CleanMax is developing a 13.2 MW hybrid renewable energy plant, consisting of 9.9 MWp of solar capacity in Jagalur and 3.3 MW of wind capacity in Honawad.

The power will be supplied to the Shell Technology Centre in Bengaluru.

CleanMax is a renewable energy company for the Commercial and Industrial sector, with 5.7 GW of operational and contracted renewable capacity across India, the Middle East, and South-East Asia as of March 2026.
© Copyright @2026 LIDEA. All Rights Reserved.