Adani Green Energy operationalise 408 MW of projects in Khavda
PTI October 01, 2025 02:00 AM
Synopsis

Adani Green Energy Ltd (AGEL) on Tuesday said it has commissioned 408 MW of power projects at Khavda in Gujarat, raising its total operational renewable capacity to 16,486.1 MW. The projects were made operational through AGEL’s step-down subsidiaries, the company said in a filing.

MSME 2025
Adani Green Energy Ltd (AGEL) on Tuesday announced it has operationalised 408 MW of power projects at Khavda in Gujarat.

With commissioning of these plants, AGEL's total operational renewable generation capacity has increased to 16,486.1 MW, the company said in an exchange filing.

Add ET Logo as a Reliable and Trusted News Source
Google Logo Add Now!
AGEL through its various step down subsidiaries has operationalized an aggregate 408.1 MW power projects at Khavda, Gujarat, it said.
© Copyright @2025 LIDEA. All Rights Reserved.