Delhi-Dehradun Expressway: The Delhi-Dehradun Expressway, a 212-kilometre-long highway, is nearing completion and is expected to reduce travel time between Delhi and Uttarakhand. But, a single house in Mandola, near the Delhi-Ghaziabad border, has become a major roadblock in its progress. The house, originally owned by Veersen Saroha, has been at the center of a legal dispute since the 1990s when the UP Housing Board attempted to acquire the land.
Why is the Delhi-Dehradun Expressway delayed?Most landowners took the compensation and gave up their land, but Saroha refused and went to court. He got a legal order to stop the land from being taken. Even after many years, the fight over the land is still going on. In 2024, his grandson, Lakshyaveer, took the case to the Supreme Court. Now, the case has been sent to the Lucknow bench of the Allahabad High Court, which will hold a hearing on April 16.
Delhi-Dehradun Expressway: Legal battle over land acquisitionAfter Saroha passed away, the legal fight continued. In 2024, his grandson Lakshyaveer filed a petition in the Supreme Court, claiming that the UP Housing Board did not have the right to transfer the land to the NHAI. The Supreme Court has now referred the case to the Lucknow bench of the Allahabad High Court, with a key hearing scheduled for April 16, 2025.
How important is the Delhi-Dehradun Expressway?The expressway plans to reduce travel time from Delhi to Dehradun to under 2.5 hours. A key stretch of the road, from Akshardham to Baghpat via Loni, includes a 20-km elevated section for smooth travel. The Delhi-Dehradun Expressway project is expected to boost tourism, trade, and development in the region.
Supreme court’s decision on April 16, 2025The Supreme Court has asked for a speedy resolution, considering the importance of the Delhi-Dehradun Expressway. The upcoming hearing on April 16, 2025, will determine whether the expressway can finally open. Until then, one house in Ghaziabad remains the biggest roadblock in completing this major infrastructure project.
FAQs1. Why is the Delhi-Dehradun Expressway delayed?
Answer: The Delhi-Dehradun Expressway project is delayed due to a legal dispute over a house in Mandola, Ghaziabad.
2. When will the Supreme Court decide on the Delhi-Dehradun expressway opening?
Answer: The Supreme Court will hear the case on April 16, 2025. A final decision is expected soon after.
3. How will the Delhi-Dehradun expressway benefit travellers?
Answer: The Delhi-Dehradun Expressway will reduce travel time to under 2.5 hours, making travel between Delhi and Uttarakhand faster and smoother.
4. What is the length of the Delhi-Dehradun Expressway?
Answer: The Delhi-Dehradun expressway is 212 km long, stretching from Delhi to Dehradun.
5. Which areas will the Delhi-Dehradun expressway cover?
Answer: The Delhi-Dehradun expressway will connect Delhi, Ghaziabad, Baghpat, Shamli, Saharanpur, and Dehradun, providing better connectivity and faster travel.
For more informative articles on historical and upcoming events from around the world, please visit Indiatimes Events.